Sahara Contracting Corp, Civil and steel works in jordan

PROJECTS

world plastics factory

world plastics factory


3/10/2005 World Plastics Factory in Qastal. Works included civil works , supply and erection of Steel Building
Flagpole, Aqaba

Flagpole, Aqaba


8/1/2004 Civil works and erection of the highest flagpole in the world (132m). To be completed by mid August 2004. Client Royal Hashmite Court.
Union Chemical Industries & Vegetable Oil Factory (Phase I), Jiza (1995)

Union Chemical Industries & Vegetable Oil Factory (Phase I), Jiza (1995)


1/1/1995 Works included all civil works and erection of Zamil Steel Buildings with an approximate built up area of 7.000 sq.m.

Union Tobacco Factory (phase 1), Jiza (1995)

Union Tobacco Factory (phase 1), Jiza (1995)


1/1/1995 Works included all civil works and erection of Zamil Steel Building with approximate built - up area of 4.500 sq.m.
Al - Mifleh and Al Taher steel factory, Sahab (1994)

Al - Mifleh and Al Taher steel factory, Sahab (1994)


1/1/1994 The works included the erection of Zamil Steel Pre - Engineered Buildings (7000 sq.m.) with overhead cranes.
Previous   1 2
Page 2 of 2

Copyright © Sahara Contracting Corp. 2009 All rights reserved.
Designed and developed by: Kensoft Web Development, Web hosting windows asp.net 3.5/2.0, SQL server